Gre­ven­broich Repo

In Gre­ven­broich, old tur­bi­nes were repla­ced by new ones in 2016. The new machi­nes have a capa­ci­ty of 2.5 MW per tur­bi­ne and the­r­e­fo­re offer much bet­ter ener­gy effi­ci­en­cy than the pre­vious turbines.

Contributions to the project

There are no contributions to this project.

Information

Turbines/modules

2 GE Wind Ener­gy 2.5 — 120

Total power

5 MW

Construction Period

2016

Contact